COEI has been appointed as lead and associate consultant for over 60 consultancy projects throughout the country. Our range of consultancy services include hydrodynamic data collection and processing, computer and physical modelling, environmental assessment, marine and coastal structures design, coastal stability and coastal hazards mitigations and as independent environment auditors. Our clientele includes most ports authorities in Malaysia, Petronas, TNB, Penang Bridge, government agencies, marina and resort developers and other private engineering consultants. Selected projects are listed below:
CONSULTATION PROJECTS 2007-2010 | ||
Hydraulic Study for Offshore Tin Mining in Melaka | Unit Perancang Negeri (UPEN), Negeri Melaka. | 2010 |
Masterplan for the Development of Fishing Hubs in Malaysia | BPSP, Ministry of Agriculture & ABI Malaysia | 2009 |
Sedimentation at River Mouth and Ports in Malaysia (Sabah Site) | Jabatan Laut Semenanjung Malaysia | 2008 |
Tsunami Modelling and Impact on the North West Coast of Peninsular Malaysia | Jabatan Pengairan dan Saliran Malaysia | 2007 |
CONSULTATION PROJECTS 2004-2006 | ||
Development of the National Coastal Vulnerability Index (NCVI) Study – Phase 1 | Jabatan Pengairan dan Saliran Malaysia | 2006
|
Study of Sand Extraction in Bulk Offshore Johore | Gerbang Perdana Sdn Bhd | 2006 |
Detailed EIA – Hydraulic Study For The Proposed Islands Reclamation at Palm Spring, Port Dickson, Negeri Sembilan | Tenco Development Sdn Bhd | 2005 |
Conseptual Proposal For The Protection, Restoration and Beautification of Pantai Puteri, Melaka | APEX Beach Management Sdn Bhd | 2005 |
Computer Modelling Study For The Development of The Penang Waterfront City | Jelutong Development Sdn Bhd | 2005
|
Penang Harbour Sitation Study | Penang Port Sdn Bhd | 2005
|
Hydraulic Study of the Proposed Marina at Sg. Melaka River Mouth | Jabatan Laut Semenanjung Malaysia | 2004
|
Coastal Hydraulic Modelling Study at Pantai Batu 5, Port Dickson | JKR/Apex Beach Management Sdn Bhd | 2004
|
CONSULTATION PROJECTS 2001-2002 | ||
Hydraulic Study of the Proposed Runway Extension at Pulau Layang Layang – Physical and Numerical Modelling | JKR/MSA Sdn Bhd | 2002 |
Hydraulic Study of the Proposed Reclamation at Pulau Bunting | TNB Engineering & Construction Sdn Bhd | 2002 |
Hydraulic Study of the Proposed Penang Second Crossing | Kementerian Kerja Raya Malaysia | 2002 |
Detailed Engineering Design of The Proposed Reclamation Works at Pulau Bunting, Mukim Yan, Kedah, Darul Aman – Hydraulic Study | Tenaga National Engineering & Consultant Sdn.Bhd. | 2002 |
Hydraulic Study for The Coastal Reclamation and Redevelopment of a New Township in Kuala Kedah, Kedah | Muaraman Sdn.Bhd. | 2001 |
Review Report of The Proposed Reclamation on Lots 9-13 Ujong Pasir, Mukim Alai, Daerah Melaka Tengah, Melaka | Kejuruteraan Mahajaya Sdn.Bhd. | 2001 |
CONSULTATION PROJECTS 1989-1998 | ||
Lekir Coastal Reclamation Project – Technical Advisory and Compliance Audit | State Economic Planning Unit, Perak | 1998 |
Pulau Bunting Reclamation Project – Data Collection, Hydraulic Study and Detailed EIA | SKS Venture Sdn.Bhd. | 1998 |
Kedah Coastal Reclamation Project – Data Collection, Hydraulic Study and Macro-EIA | State UPEN & NAHRIM | 1997-1998 |
Hydraulic Study for the Proposed Reclamation at Allson Cove, Langkawi | Vista Vision Sdn.Bhd. | 1997 |
Hydraulic Study and Detailed Environmental Impact Assessment of the Proposed Beach Reclamation Works at Tg. Api, Kuantan, Pahang – Data Collection, Computer Modelling and Impact Assessment | PASDEC Sdn.Bhd. | 1996 |
Land Reclamation Work for Pulau Jelita, Melaka – Hydraulic Study | Pulau Upeh Dev. Sdn.Bhd. | 1995 |
Coastal Land Reclamation Works Telok Mas to Klebang, Parcels 1,2,3 and 4 – Data Collection & Hydraulic Study | Ultra Green Sdn.Bhd. | 1995 |
Coastal Land Reclamation Works at Alai, Melaka – Data Collection, Hydraulic Study + EIA | Kumpulan Mahajaya Sdn.Bhd. | 1995 |
Coastal Land Reclamation for Marina Resort, Lok Kawi, Sabah – Data Collection, Hydraulic Study | KTS Timber | 1994 |
Coastal Land Reclamation for the Extension of Langkawi International Airport – Data Collection, Hydrographic Survey, Hydraulic Study | Jabatan Kerja Raya | 1994 |
Coastal Land Reclamation Works at Pulau Jawa, Melaka – Hydraulic Study, Hydrographic Survey, Soil Investigation, EIA + Detail Design | Melaka State Government | 1993 – 1994 |
Coastal Land Reclamation Works at Bandahilir, Melaka – Hydraulic Study | Lion Group | 1993 – 1994 |
Coastal Reclamation Works at Kuala Perlis – Data Collection, Hydraulic Study, EIA | State Economic Planning Unit, Perlis | 1992 – 1993 |
Coastal Reclamation Works at Stulang Laut, Johor Bahru – Feasibility and Hydraulic Study + Detail Design | Economic Planning Unit Malaysia | 1988-1989 |
Coastal Reclamation Works at Kuah, Langkawi – Feasibility and Hydraulic Studies | Economic Planning Unit Malaysia | 1988-1989 |